South Cheel / CAMP Parking
From Physical Plant Wiki
Project Contact: Gard Meserve
Vendor: QPK
Phase: Final Design
Links:
Finances to Date / Open Issues
Description:
The new parking lot will be constructed in the wooded area located east of the loop road with an additional 190 spaces. This parking lot will service both the Cheel Campus Center and the CAMP buildings. It will be accessible by a road that extends from the maintenance drive, located on the west side of the Cheel building.
Status:
QPK Architects are approximately 85% complete on designing the project, which also includes a small storage building for Cheel. It is anticipated that the project will go before the Village Planning Board during the first week of August for approval, and construction will begin at the end of August 2008.