NAB LAB

From Physical Plant Wiki

Jump to: navigation, search

Architect: Brooks Washburn

Contractor: Pizzagalli

Contact: Gard Meserve

Start Date: Summer/Fall 2010

Phase: Completed Project

Links:

Finances to Date / Open Issues

First Floor Floor Plan 2/17/11

Second Floor Floor Plan 2/17/11

Aerial View Layout 4/6/11

Interior Link Between CAMP and Student Center 10/16/09

North First Floor Detailed Plan 4/6/11

Interior Elevations 1/24/11

Class Room Layout


Archive:

First Floor Floor Plan 7/10/09

Second Floor Floor Plan 7/10/09

Description:

The new Nablab facility will be an extension to the existing CAMP-Rowley building complex. The project will add one classroom that will seat 56 students, 8 labs, 1 conference room, 10 offices, 1 hazardous material room, as well as a first floor walkway connector.

Photos:

2011 Construction Photos

Construction as of 1/18/12
Construction as of 1/18/12
Construction as of 1/18/12
Construction as of 1/18/12
Construction as of 1/9/12
Construction as of 1/9/12
Construction as of 1/9/12
Construction as of 1/9/12
Construction as of 1/9/12
Construction as of 1/9/12
Construction as of 1/9/12
Construction as of 1/9/12
Construction as of 1/9/12
Construction as of 1/9/12
Construction as of 1/9/12
Construction as of 1/9/12
Construction as of 1/9/12
Construction as of 1/9/12
Construction as of 1/9/12
Construction as of 1/9/12