Completed Project
Architect: Perkins and Will
Contractor: U.W. Marx
Contact: Gard Meserve
Start Date: June 2009
Phase: Punch list
Links:
Quad Webcam 2
More Info
Project Updates
Finances to Date / Open Issues
Meeting Minutes 11/12/08
Quad Schedule
Description:
The Freshman Quad Project consists of an addition to each of the 4 freshman dormatories. This project added a new 4th floor to each building with dormers to enhance the look of the buildings as well as house an additional 84 students. The project designed by Perkins and Will adds to the aesthetics and cohesiveness of the Clarkson University campus.
Existing Structure
Floor Plan
Construction as of 5/5/09
Construction as of 5/5/09
Construction as of 5/5/09
Construction as of 5/12/09
Construction as of 5/12/09
Construction as of 5/12/09
Construction as of 5/15/09
Construction as of 5/15/09
Construction as of 5/18/09
Dormer Mock-up
Interior of Dorm Room as of 7/1/09
Interior window
Interior of Dorm Room as of 7/1/09
Interior of Dorm Room as of 7/1/09
Interior Hallway
Interior window frame
Bathroom tile
Glass installation in window frame
Exterior of windows
Siding
Siding on Ross
Siding
Lounges
Bathroom
dorm room furniture
Showers