ERC - Library 1st Floor/Student Affairs/Study
From Physical Plant Wiki
Architect: Perkins and Will
Contractor: CU Staff
Contact: Gard Meserve
Start Date: Summer/Fall 2010
Phase 1: Completed Project
Links:
Description:
The ERC renovation includes plans to reposition the library periodicals in the 2nd floor space with an internal staircase so the library is then consolidated into one area of the building. The area outside of this second floor space will be turned into interview/study rooms for students. The 1st floor area will combine the health center and counseling center in order to make both more centrally located on campus with easier access to students.
Status:
Phase I of this project is complete. Phase II does not yet have an expected start date.